SAND CONFINEMENT GRID SOLUTIONS FOR FLOODFIGHTING, MILITARY AND HOMELAND SECURITY

RAPID DEPLOYMENT
FLOOD WALL

RDFW TRAINING VIDEO
AND MANUAL

DISCOVERY SCIENCE CHANNEL'S
ECO-TECH SHOW ON RDFW

POWERPOINT OVERVIEW FOR US ARMY
CORPS OF ENGINEERS

RDFW BROCHURES
(PDF FORMAT)

RDFW TESTING VIDEOS

SECURITY AND MILITARY APPLICATIONS

NEWS

ABOUT GEOCELL SYSTEMS

CONTACT US

GSA SCHEDULE

LINKS

PRESS KIT

























US Army Corps of Engineering
RDFW Testing Videos

In April of 2000, Geocell Systems Inc. conducted full scale testing of the Rapid Deployment Flood Wall under a Cooperative Research and Development Agreement (CRADA) with the U.S. Army Corps of Engineers.


Click here to view testing video (medium version)—7.7 MB
Click here to view testing video (large version)—25.6 MB

A section of RDFW was assembled in the wave tank at the Engineer Research and Development Center (ERDC), Waterways Experiment Station (WES) in Vicksburg, Mississippi.

This section of wall was exposed to both standing water and pounding wave action. Standing water test duration was 128 hours, with water heights between 24 and 40 inches. Wave testing lasted 40 hours, with wave heights up to 1.52 feet.

The RDFW performed phenomenally, resisting over 72,000 wave cycles with minimal deformation and and underseepage.

 

Geocell Systems, Inc., Suite 202, Pier 54, Terry Francois Blvd., San Francisco, CA 94158
Tel: (415) 541-5300 Fax: (415) 541-5369, marketing@geocellsystems.com